13th May 2025

Te Anga Site Power Upgrade, scheduled 1 day ago

We have scheduled maintenance to change out the power supply for our Te Anga Site.

There is a possibility there could be a small backhaul outage of 15 minutes while this happens.

The maintenance window for this is 15/05/2025 between 10am and 1pm. Dependent on weather. The backup date to do this is on the 16/05/2025.