20th January 2020

View Road Upgrades, scheduled 11 months ago

We will be upgrading our main backhaul from View road to Puketutu between 10am and 2pm on Friday the 24th This will affect the following sites: View Road, Puketutu, Rangitoto, and Owawenga.

This is expected to take an hour and a maximum downtime of 5 minutes as we realign the main backhaul link, how ever all sites will be running on backup links with reduced capacity.

Update: 24/1/2020 1PM: All upgrades completed as expected with minimal downtime.